Power and generators for outdoor events

Stage rigs, food vendors and site lighting all need safe, reliable power. How to plan your requirements, use generators safely and keep leads and equipment compliant.

By Weslo Events Last reviewed: October 2026 7 minute read
A large arched festival stage with LED video screens, line-array speakers and lighting rigs above a crowd under a blue sky

01

Plan power early

Most events need power, whether from existing mains supply or temporary generators. Some council parks and reserves have mains power, but many outdoor sites need generators. Power brings real risks, including electric shock, fire, trips and carbon monoxide, so it belongs in your event risk management plan.

Consider your program alongside your power needs. Generators can be expensive and noisy. For smaller events, weigh the value of each powered item against the cost and planning it adds.

02

Work out what you need

Before you book a generator or electrician, collect the requirements for everything that needs power:


Stage sound, lighting and screens


Food vendors, coffee machines and refrigeration


Rides and amusements


Site lighting, toilets and event control


Ticketing, Wi-Fi and payment systems


Charging for radios and phones

Ask every stallholder and supplier to tell you what they will plug in, its power rating, and whether it needs single-phase or three-phase supply. Add a margin of around 10% for incidentals, and plan for peak loads such as everything switching on at once.

In your confirmation to stallholders, make it clear they may only connect the equipment you have approved, and that all leads and appliances must be in good condition and tested and tagged.

03

Mains power or generators

If you plan to use mains power from an existing power box or pavilion, get permission from the council or venue first, and don’t assume every outlet works. Have them tested before the event. New temporary connections to the grid are arranged by a licensed electrician through SA Power Networks and need plenty of lead time.

If you need generators, use a reputable hire company. Give them your full power requirements and discuss leads, distribution boards, RCD protection and cable protection at the same time. Order more cable matting than you think you need.

04

Generator safety

Generators and their fuel create hazards of their own. Make sure that:


Generators are outdoors, well away from tents, marquees, stages and crowds, with exhausts pointing away from people


They are fenced or barricaded so the public can’t reach them


They are earthed and set up as required by AS/NZS 3010


Refuelling happens with the engine off and cool, away from ignition sources


Fuel is stored in approved containers away from the public


Fire extinguishers suitable for fuel and electrical fires are within reach


Noise is considered, especially near homes and quiet areas



Never run a generator indoors or in an enclosed or partly enclosed space. SafeWork SA warns that carbon monoxide from fuel-powered engines is colourless and odourless, and has caused deaths in South Australian workplaces.

05

Who does what

In South Australia, electrical installation work must be done by a licensed electrician. They must issue a certificate of compliance before the installation is switched on, as regulated by the Office of the Technical Regulator. Temporary installations at shows and events are covered by Australian Standard AS/NZS 3002.

Task Who What to ask for
Wiring, distribution boards, connecting generators Licensed electrician Certificate of compliance before switching on
Inspecting and testing leads and appliances Competent person (test and tag) Tag showing test date and result
Supplying and positioning generators Reputable hire company Service records, fuel and earthing
Monitoring on the day Electrician on site or on call Authority to isolate unsafe equipment

Testing and tagging leads and appliances doesn’t have to be done by an electrician. It can be done by a competent person trained to test to AS/NZS 3760. Ask suppliers and stallholders for current tags before they connect.

06

Leads, power boards and cable safety


Use one lead of the right length rather than joining leads together, which can overheat


Avoid double adaptors and piggyback plugs, and don’t overload power boards


Make sure outlets in public areas have RCD (safety switch) protection


Place equipment close to its power source to keep leads short


Run leads under cable ramps or matting, or tape them down where people walk


Where leads can’t be covered, barrier them off so they aren’t used as a path


Never thread leads through trees. Overhead cables must use approved supports, installed by a licensed electrician


Keep leads and connections out of water and protected from the weather

At any point, if you or your staff aren’t satisfied that a power setup, lead or appliance is safe, act on it. As the organiser, you can disconnect anything that puts people at risk.

07

On the day


Have a licensed electrician on site, or on call for smaller events


Walk the site before opening to check leads, covers, barriers and generator fencing


Check that stallholders have only connected approved equipment


Monitor fuel levels and refuel safely during quiet periods


Know where to isolate power in an emergency, and brief event control


Have back-up lighting for exits and first aid if power fails

Wet weather increases electrical risk. See our guide to extreme weather planning for storm and rain procedures.

08

Reducing energy use and emissions

Power for lighting, sound and generators is a significant source of an event’s emissions, alongside transport and food. Once you have reduced what you need, consider:


Switching mains supply to GreenPower-accredited renewable electricity


LED lighting and energy-efficient equipment


Correctly sized generators, since oversized units waste fuel


Hybrid generators with battery storage, or solar and battery systems for smaller loads


Renewable diesel or biodiesel, where the generator supplier approves it


Offsetting remaining emissions, or certifying the event through Climate Active

Pedal-powered generators and solar sound systems can be a fun addition for community events, but check the provider is still operating and the setup suits your power needs.

09

Event power checklist


Have you listed every powered item and its power requirements?


Do you know whether you need single-phase or three-phase supply?


Have you allowed around 10% extra capacity?


Have you got permission to use mains power, and tested the outlets?


Is your generator supplier providing leads, distribution boards and cable matting?


Are generators outdoors, fenced and away from people and structures?


Is a licensed electrician installing and certifying the setup?


Is every lead and appliance tested and tagged?


Are all leads covered, taped or barriered?


Who is on site to isolate power in an emergency?

See our Event Management service →

10

Sources and further reading

Office of the Technical Regulator: Electrical trades

Electrical licensing, safety and certificates of compliance in South Australia.

Visit the OTR →

SafeWork SA: Carbon monoxide safety alert

The risks of fuel-powered engines in enclosed spaces.

Read the alert →

AS/NZS 3002:2021 Electrical installations – Shows and carnival events

The standard for temporary electrical installations at events.

View the standard →

AS/NZS 3010:2017 Electrical installations – Generating sets

The standard for connecting generators.

View the standard →

GreenPower

Government-accredited renewable electricity.

Visit GreenPower →

Climate Active

Carbon neutral certification for events.

Visit Climate Active →


This article is general information for event organisers in South Australia. It is not electrical or legal advice. All electrical installation work must be carried out by a licensed electrician.

Planning a large outdoor event?

Weslo Events can coordinate power, site layout, staffing and safety with your suppliers.

Talk to Weslo